Main Street Ocean Outfall, City of North Myrtle Beach, South Carolina
The project consisted of on-shore and off-shore design of a single 84-inch diameter gravity feed
Home / Campus Infrastructure Replacement, North Dakota State College of Science
"Bolton & Menk, Inc. worked as a true partner to the Campus throughout the design and construction of this project. They took an active listening approach to our needs, wants and concerns throughout the project. With their assistance in planning and coordination with the Campus and the contractors, we did not have to cancel a single event on Campus during the project."
- John Richman Ph.D., President
NDSCS is North Dakota's premier trade technical college. The campus was plagued by water and sewer issues due to aged infrastructure. The North Dakota State Legislature appropriated $13.3 million to address the infrastructure issues at NDSCS. The college used the funds to replace the utility infrastructure and perform a campus-wide assessment of pedestrian, ADA, parking, and traffic movement needs. The resulting recommendations from this study led to a complete a refresh of the existing system that would improve the environment for all modes of travel.
Bolton & Menk worked with campus representatives to develop and implement a variety of improvements to streamline traffic flow, provide clarity in pedestrian crossings and movements, and better manage parking throughout the campus. Enhanced pavement markings and signage complemented by curb extensions, median islands, and strategic parking restrictions added clear and concise guidance that allowed all users to safely and efficiently move and exist within the campus. Additionally, a robust public and campus information campaign was implemented, which included a project-specific website, social media and text alerts, and public/campus meetings. Because of innovative planning and engineering, the campus underwent its most important, intrusive, and disruptive project – all while maintaining full operational capacity, classes, and additional events. The campus now has state-of-the-art utilities, enhanced transportation network, and campus beautification through landscape architecture.
The project consisted of on-shore and off-shore design of a single 84-inch diameter gravity feed
Geotechnical investigation was completed from above the frozen lake, saving the expense of barge borne
110 East is a 23-story, 370,000 square-foot LEED Gold and WiredScore Platinum-certified office tower in
The practices and coordination efforts are expected to be carried forward into an annual program
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.