
South Elevated Tower, Spencer Municipal Utilities, Iowa
A spheroid style tank replaced the existing damaged multi-legged south tower.
Home / Cleveland Lift Station, City of Roseville, Minnesota
The new lift station was constructed south of the existing station and installed while the old station was still operating, eliminating the need for expensive bypass pumping.
The Cleveland Lift Station had numerous deficiencies, including capacity issues, inflow and infiltration issues, and a need for a generator. Bolton & Menk prepared a feasibility study, developed plans and specifications, and performed construction engineering services for the replacement of the existing lift station and forcemain. The existing lift station was a Smith and Loveless wet well/dry well station. The new lift station includes a precast wet well with two submersible pumps and a precast valve vault. The project included a new natural gas emergency backup generator and control panel. The project also included replacing the existing forcemain with a new directionally drilled high density polyethylene (HDPE) forcemain. The new lift station was constructed south of the existing station and installed while the old station was still operating, eliminating the need for expensive bypass pumping. The design incorporated new controls and SCADA interfacing. The city now has an updated facility to serve the homes and commercial properties in the area.
A spheroid style tank replaced the existing damaged multi-legged south tower.
Bolton & Menk provided wastewater treatment solutions to help Tyson Foods meet Iowa Nutrient Reduction
The city’s vision and proactive input throughout the project resulted in a facility that consistently
The pretreatment facilities successfully achieved the reduction in CBOD and TSS parameters required by the
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.