
Main Lift Station, City of Two Harbors, Minnesota
Bolton & Menk developed a facility plan to obtain funding assistance through the state’s Clean
Home / Water Tower Rehabilitation, City of Sherburn, Minnesota
Information was gathered to get a clear understanding of what the logo needed to symbolize and represent for the city.
The City of Sherburn decided they wanted an updated logo painted on their tower as part of their water tower rehabilitation project. The tower was being rehabilitated at the same time a new water treatment plant was being built. They determined that a new logo could be used in the signage for the new water plant as well.
Bolton & Menk worked with the city to gather information and get a clear understanding of what the logo needed to symbolize and represent for the city. Several logo options were presented with possible layouts for letterhead and business cards along with water tower renderings and other signage to help the city visualize what their new logo would look like in many different scenarios.
The approved logo was used on the newly rehabbed tower and water treatment plant signage. The city also refreshed all city stationery items with the new logo.
Bolton & Menk developed a facility plan to obtain funding assistance through the state’s Clean
Bolton & Menk provided engineering design services for upgrades at two wastewater treatment facilities at
Proper reinstallation of the telecommunications equipment was an essential variable to ensure the new protective
This project has been a huge investment in our community’s infrastructure, and updates an essential
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.