
Turtle Creek Flood Mitigation, City of Austin, Minnesota
The City of Austin will rest assured that homeowners, business owners, and other recreationists remain
Home / High School Stormwater Reuse Project, Forest Lake Area Schools
"The construction of an onsite stormwater capture and reuse system, and the development of integrated curriculum, has provided a laboratory experience where students can explore, observe, and analyze the sustainability of this new technology in several different courses."
- Mike Miron, Forest Lake Area High School Career & Tech Ed/Work Based Learning Coordinator
A partnership was developed amongst the City of Forest Lake; Rice Creek Watershed District; the Minnesota Department of Health; Forest Lake Area Schools; Forest Lake High School environmental, biology, and agriculture faculty; and the student-led environmental club. Their commitment to environmental protection, education, and sustainability brought unique perspectives to this project that received more than $500,000 from the Board of Water and Soil Resources Clean Water Fund.
The first phase at Forest Lake High School included a new stormwater basin to filter and treat stormwater. The basin was converted to a wet pond to store water and receive runoff from a drainage area of 19.9 acres, including 14.3 acres of impervious surfaces. In order to irrigate approximately 12 acres of athletic fields, this pond provides a storage volume for the existing irrigation system. Stormwater pond retrofits and a new irrigation infrastructure helps reduce the high school’s potable groundwater usage by more than 4 million gallons per year.
Through science and technology curriculum development, teachers and students will monitor water used compared to stormwater harvested for irrigation.
The City of Austin will rest assured that homeowners, business owners, and other recreationists remain
The west bank was highly susceptible to further erosion and threatened two office buildings.
With coordination from multiple stakeholders in the project, the rock riffle project overcame hurdles and
A new detailed hydraulics model of the dam was built which included not only the
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.