Country Hollow Lift Station Rehabilitation, City of Eagan, Minnesota
The lift station is located between two homes and therefore the project needed to be
Having started as an intern at Bolton & Menk, Seth now leads one of the largest environmental groups in the Upper Midwest as the water/wastewater division leader. Seth began engineering in 1995 and now serves as the principal environmental work group leader and serves on the firm's Board of Directors. If someone has a design or water problem, he is willing to do what it takes to figure it out. Seth says, "Engineers at heart are problem solvers." His background includes planning and design of water and wastewater treatment facilities, securing permits, working with regulatory agencies, and construction management. Seth has determination both inside and outside of work, having run more than 16 marathons and numerous 200-mile relays.
The lift station is located between two homes and therefore the project needed to be
A temporary Class A biosolids treatment was designed and procured for the city for interim
The new lift station was constructed south of the existing station and installed while the
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.