Road Relocation and Runway 14/32 Extension, City of Jefferson, Iowa
To minimize the length of time the airport was without an operational instrument approach, proper
Home / Runway 14/32 Reconstruction & Widening, City of Sauk Centre, Minnesota
Widening Runway 14/32 to 75 feet allowed for a safer operational environment for pilots, considering the airport does not have a parallel taxiway.
Runway 14/32 has had numerous crack repairs completed since its original construction in 1990. The ride quality was so poor several aircraft diverted to adjacent airports. Major distresses included block cracking, longitudinal and transverse cracking, patching, raveling, and rutting. Additionally, the runway was only 60 feet wide.
Widening Runway 14/32 to 75 feet allowed for a safer operational environment for pilots, considering the airport does not have a parallel taxiway. To maximize the amount of federal funds available, a modification to AIP standards was submitted to use MnDOT specifications for construction. Using MnDOT specifications allows for lower bid prices as contractors are more familiar with the products and bituminous mixture is more readily available. Construction was recently completed. The amount of federal funding available will allow the airport to also reconstruct the taxiway connector and apron.
To minimize the length of time the airport was without an operational instrument approach, proper
The successful relocation of Perry Municipal Airport's runway not only enhanced safety but also opened
The FDR process allowed the city to rehabilitate Runway 15/33, Taxiway A, and the apron
Bolton & Menk worked with the FAA to reconfigure the taxiways so taxilanes in both
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.