Road Relocation and Runway 14/32 Extension, City of Jefferson, Iowa
To minimize the length of time the airport was without an operational instrument approach, proper
Home / Runway 11/29 and 18/36 Pavement Rehabilitation, City of Worthington, Minnesota
The project saved the city from costly pavement repairs.
The existing bituminous pavement on Runway 11/29 was last rehabilitated in 2007. Since that time the existing cracks had widened, the longitudinal joints have deteriorated, and the surface aggregate began to be exposed. The bituminous pavement on Runway 18/36 was constructed in 2007. Since that time no pavement rehabilitation had been completed.
For Runway 11/29, the project involved crack repair, patching of the transverse pavement joints, two part crack repair for wider cracks, and application of an asphalt seal coat. For Runway 18/36, the project involved crack repair, two part crack repair for wider cracks, and application of an asphalt seal coat.
The pavement life for Runway 11/29 and 18/36 is now extended, thus saving the city from costly pavement repairs.
To minimize the length of time the airport was without an operational instrument approach, proper
Widening Runway 14/32 to 75 feet allowed for a safer operational environment for pilots, considering
The successful relocation of Perry Municipal Airport's runway not only enhanced safety but also opened
The taxiway was opened the day after construction was completed.