Runway 14/32 Reconstruction & Widening, City of Sauk Centre, Minnesota
Widening Runway 14/32 to 75 feet allowed for a safer operational environment for pilots, considering
Home / Taxiway C Extension, City of Worthington, Minnesota
The taxiway was opened the day after construction was completed.
Taxiway C is a partial parallel taxiway to Runway 18/36. The taxiway ended 1,100 feet south of the Runway 18 threshold. In order to increase safety operations on Runway 18/36, Taxiway C was extended 1,100 feet to the Runway 18 threshold. This provides a full parallel taxiway to Runway 18/36 and avoids back-taxiing on the runway. The project was completed within the allowable federal funding. The taxiway was opened the day after completing construction to the joy of the many airport users.
Widening Runway 14/32 to 75 feet allowed for a safer operational environment for pilots, considering
The funding involved creative financing through borrowing federal non-primary entitlement funds, MnDOT matching funds, and
The FDR process allowed the city to rehabilitate Runway 15/33, Taxiway A, and the apron
Surface drainage would pond on each taxilane and eventually back up into each hangar.
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.