
110 East, Stiles Corporation
110 East is a 23-story, 370,000 square-foot LEED Gold and WiredScore Platinum-certified office tower in
Home / 25th Avenue South Ocean Outfall, City of Myrtle Beach, South Carolina
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach.
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach. The Yaupon Drainage Basin includes approximately 189 acres of commercial and residential land uses. Bolton & Menk provided the design services to convey the stormwater runoff beyond the beach, piping it offshore 1,200 feet in the Atlantic Ocean. In addition, several large underground junction boxes were included in the design to create water quality improvements before the stormwater is released into the Atlantic Ocean.
110 East is a 23-story, 370,000 square-foot LEED Gold and WiredScore Platinum-certified office tower in
This project is part of the larger Blake Farm master plan along NC-17, which will
The design of the plaza relates to the existing historic site and matches the architecture
The first phase of the project, which included design of 468 lots, 3 sewage pump
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.