
Cedar Lake Road Improvements, City of St. Louis Park, Minnesota
These new pedestrian and bicycle facilities along Cedar Lake Road will serve as a safe
Home / Main Street Trail, City of Fridley, Minnesota
The project extends the trail south across I-694 and enables residents living in southern Fridley and northern Columbia Heights to reach transit, employment, and commercial areas.
An existing Main Street (Anoka County CSAH 102) Bridge did not provide a safe crossing for pedestrians and bicyclists. There was no separation from traffic and only 1.5-foot shoulders. Visibility was limited due to the crown of the bridge and heavy truck use made on-road crossing dangerous.
Bolton & Menk completed a $1.9 million federal aid project consisting of 8,500 feet of shared use trail connecting 44th Avenue to 57th Avenue on the west side of Main Street. A 200-foot prefabricated steel through truss pedestrian bridge spans I-694.
The project provides a connection for pedestrians and bicyclists on Main Street. The project extends the trail south across I-694 and enables residents living in southern Fridley and northern Columbia Heights to reach transit, employment, and commercial areas.
These new pedestrian and bicycle facilities along Cedar Lake Road will serve as a safe
A 207,500-square-foot multi-purpose natural turf recreation field was constructed along with a 10-foot multi-purpose sidewalk.
The existing Hillside Drive roadway was raised 3 to 4 feet above existing grade to
Public outreach through hosting various technical and community advisory meetings, multiple open house/public information meetings,
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.