Home / Iowa River Streambank Stabilization, City of Iowa City, Iowa
The west bank was highly susceptible to further erosion and threatened two office buildings.
The west bank of the Iowa River had drastically eroded. Contributing factors included saturated banks, scour at the bank’s toe, and loss of armoring and vegetation. The west bank remained highly susceptible to further erosion as well as threatened two office buildings, a gas main, and a fiber optic line. Bank stabilization and permanent protection from future erosion were essential.
Bolton & Menk conducted a study to determine available design options. This section of the Iowa River—a sovereign river—is in the FEMA floodway and known to have endangered freshwater mussels. We completed a HEC-RAS no rise analysis, worked with a malacologist to search for endangered mussels, and created plans that complied with FEMA, Clean Water Act, and Sovereign Lands rules.
Pre-application coordination with review agencies resulted in approval of all permits with a single permit submittal. Final design included 900 feet of shoreline stabilization with a revetment toe, a retaining wall with a natural stone aesthetic, a “fisherman’s” path along the water edge, and space for a future multiuse trail on top of the retaining wall.
Over the course of this project, Bolton & Menk developed a trusting partnership with those
As we worked through the key drivers to low salt design, the light bulbs were
Both traditional and bioengineering stabilization methods were considered.
With coordination from multiple stakeholders in the project, the rock riffle project overcame hurdles and