
Baihly Summit Drive Water Tower Telecommunications Equipment Reinstallation, Rochester Public Utilities, Minnesota
Proper reinstallation of the telecommunications equipment was an essential variable to ensure the new protective
Home / Wastewater Facility Upgrades, Harris Ranch Beef Company
Bolton & Menk provided engineering design services for upgrades at two wastewater treatment facilities at Harris Ranch Beef Company.
Harris Ranch Beef Company was required to upgrade wastewater treatment facilities at its Selma, California beef packing plant. Harris constructed primary and secondary treatment facilities for BOD, nitrogen, and phosphorus removal prior to land application.
Bolton & Menk provided engineering design services to both treatment facilities. The primary treatment processes included screening, grit removal, flow equalization, and dissolved air flotation with chemical pretreatment. The secondary treatment processes included anaerobic lagoon with biogas capture and activated sludge with nitrogen and phosphorus removal. The plant was designed to reduce the total nitrogen concentration from 250 mg/L to less than 30 mg/L.
Proper reinstallation of the telecommunications equipment was an essential variable to ensure the new protective
To assist with their understanding of the complex project, Bolton & Menk used state-of-the-art AutoCAD
Bolton & Menk provided wastewater treatment solutions to help Tyson Foods meet Iowa Nutrient Reduction
“For most communities in the Upper Midwest, home water softeners are the primary source of
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.